Showing posts with label ORA-16138: end of log stream not received from primary. Show all posts
Showing posts with label ORA-16138: end of log stream not received from primary. Show all posts

Saturday, 24 March 2012

ORA-16138: end of log stream not received from primary

ORA-16138: end of log stream not received from primary

Cause: The standby system has not received notification that the primary system log stream has been terminated. A graceful switchover is not possible.

Action: Verify that the primary log stream has been terminated. Ensure that the standby has applied all necessary redo from the primary system and, if appropriate, reissue the graceful switchover command.